Photo 1 of 3

Key details

Type
Residential Land
Title
Certificate of Occupancy
Address
Wuye, Abuja
Access Road
Paved Road
Property Use
Residential
Square meters
1,220 sqm
Type of Purchase
Outright Price
Development Status
Fully Developed

1,220sqm Residential Land with C of O in Wuye, Abuja Highlights

  • Prime Residential Location — Wuye is a well-established district in Abuja known for its residential appeal. It offers a blend of tranquility and accessibility to key city amenities.
  • Generous Land Size — A plot of 1220 square meters provides ample space for building a substantial family home or multiple units, allowing for flexible design and landscaping.
  • Established Infrastructure — Properties in developed areas like Wuye typically benefit from existing infrastructure, including access to paved roads and potentially utilities.
  • Clear Title Documentation — A Certificate of Occupancy (C of O) is a crucial land title document in Nigeria, signifying legal ownership and rights to the land.
  • Ready for Development — The 'Fully Developed' status suggests that the land is prepared for construction, with surrounding areas likely having established services.

Description

Safety Tips
  • Meet in a safe, public place
  • Check the item before you buy
  • Pay only after collecting the item
  • Beware of unrealistic offers

Compare

This item820sqm Land with Demolishable Building, Gbagada Phase 2820sqm Land with Demolishable Structure, Gbagada GRA Phase 2
TypeResidential LandResidential LandResidential Land
TitleCertificate of OccupancyDeed of Conveyance, Deed of Assignment—
AddressWuye, AbujaDecent neighborhood at Gbagada phase 2Gbagada gra phase 2
Access RoadPaved Road——
Property UseResidentialResidentialResidential
Square meters1,220 sqm820 sqm820 sqm
Type of PurchaseOutright PriceOutright PriceOutright Price
Development StatusFully Developed——
Price₦ 780,000,000₦ 820,000,000₦ 820,000,000

Similar Ads

See all
820sqm Land with Demolishable Building, Gbagada Phase 2₦ 820,000,000

820sqm Land with Demolishable Building, Gbagada Phase 2

Phase 27 h ago