Uncompleted 4-Bedroom Building at Lintel Level, Oluwo Highlights
Frame Finished Construction — The building's structural frame is complete, indicating it has progressed beyond the foundation and initial framing stages. This phase typically involves erecting walls and roof structures.
Lintel Level Completion — The lintels, which are structural elements placed over openings like doors and windows, have been installed. This signifies a significant step in the construction process, preparing for further wall building.
Potential for Four Bedrooms — A four-bedroom layout is designed to offer ample living space, suitable for larger families or those requiring dedicated rooms for guests, home offices, or hobbies.
Four Bathroom Configuration — With four bathrooms, this property is designed for convenience and comfort, reducing wait times and offering privacy for multiple occupants.
Future Commissioning in 2027 — The projected completion date is 2027, allowing potential buyers to plan their move or investment timeline accordingly.
Generous Property Size — The property offers a substantial area, providing ample room for living spaces, potential outdoor areas, and future landscaping.
Description
• Uncompleted 4-bedroom building situated at lintel level.
• Located in a peaceful and serene environment.
• Benefits from Band A electricity supply.
• Accessible via motorable road networks.
• Property Size: 600 sqm.
• Construction Status: Frame Finished.
• Expected House Commissioning: 2027.